Work Experience and Projects
DELTA ENGINEERING SERVICES, Markham Ontario
Structural Design Engineer (May. 2000-Sept. 2001)
- Computer Analysis and design of Steel Building frames (light commercial and secondary structures in light industrial buildings), Stress check of GRC Domes (Glass Reinforced Concrete)
- Preparation of Structural, Execution and Erection Drawings
- Site inspections/measurements and preparation of as-built drawings
- Project management and tracking of on-going construction job
PROGRESSIVE CONSULTANTS Ltd., Lahore Pakistan
Senior Engineer Structures and Computer Aided Design (1998-2000)
Structural Engineer (1995-1998)
FJFC
(Fauji Jordan Fertilizer Complex) 1350 t/d DAP Plant, 1670 t/d Urea Plant and 1350 t/d Ammonia Plant |
|
Rousch Power Plant
412 MW Combined Cycle |
|
Bestway Cement Plant
3300t/d |
|
Attock Oil Refinery
Up-gradation Project |
|
PARCO Mid Country Refinery
(Pak Arab Refinery Company) |
|
Al-Taweela A2 Power Plant
750 MW Combined Cycle |
|
Saba Power Plant
288 MW Barge mounted power plant |
|
Engro Chemicals
(Formerly EXXON) |
|
ICI Polyester Fiber Plant
|
|
NESTLE Milk Pak Plant
|
|
Saudi German Hospital
|
|
LDM building, Dubai
|
|
Miscellaneous
|
|
ISO Coordination
As an ISO coordinator the responsibilities include documentation of design criteria, preparation and implementation of check lists for design steps and procedures, setting of standards for drafting and design check criteria, procedures for the flow of information to and from the design section, coordination with other departments and report writing criteria.
As an ISO coordinator the responsibilities include documentation of design criteria, preparation and implementation of check lists for design steps and procedures, setting of standards for drafting and design check criteria, procedures for the flow of information to and from the design section, coordination with other departments and report writing criteria.